How Do Building Inspections in Adelaide Work?

Building Inspections in Adelaide Work

Building Inspections in Adelaide Work

Building inspections are rather important parts of any construction process or home buying process. When you decide to buy a house, it is always better to ask a building inspector to inspect the property that you wish to buy. This will let you find out about any possible defects with the structure and also bargain on the cost of the property if needed.

Similarly, building inspection is also important in any construction process. Even if the contractor is one of the best and is really good at his work, getting a building inspected is still crucial. A building inspector is there to help you and to help any future inhabitants. If you work with any of the general contractors, you will be protected by the inspector as he ensures that the entire construction fulfils the minimum safety and standard requirements.

How Does It All Work?

The process of building inspection Jims Adelaide works in a pretty simple manner. If you can understand how it all works out, things will become much simpler for you.

  • Number of Inspections: The number of inspections needed for a construction project basically depends upon the size of the overall project. For example, small sized projects will require just a single or sometimes two inspections. Even when it comes to changing a water heater, a simple and quick inspection is all that it takes to confirm the safety and clearance of the installation.
  • Scheduling an Inspection: When it comes to scheduling an inspection, it will either be you or your contractor. The initial inspection needs will be instructed to you by the plan checker and the next requirements will be communicated to you by the inspector himself.
  • Concrete Inspections: Talking about concrete inspections, it basically includes grade beams and pier inspections that is carried out before pouring the concrete. The timing of most of the inspections, including the concrete inspection, is determined by common sense. It is not possible to inspect pier depths once concrete is poured.
  • Inspecting The Utility Piping: Before all the trenches for various underground water service, electrical service, and sewer laterals are covered up, the building inspector will wish to have a look at the different installations as long as the work is still left exposed. He will want to check whether the minimum trench clearances and depths are maintained for different utility types.
  • Inspections of the Different Floors: The job of a building inspector also involves inspecting all the various underfloor ductwork, plumbing, and insulation before the floor sheathing material is installed. He will make it a special note of the joists in order to make sure that the layout and the material match the details of the approved structural plan. He will also confirm when all of these are properly secured with all the necessary installation of hardware.
  • Roofs and Exterior Walls: The building inspector will also inspect the roofs and the exterior walls of a building to make sure that everything is in place. Lathing, exterior shear, and roof sheathing will be inspected carefully.